Home » Products » Main Stub-Out Assemblies

Main Stub-Out Assemblies

GHP Systems, Inc. fabricates large main supply and return stub-outs for connecting the wellfield system to the mechanical room. These assemblies provide the pipe transition point for bringing the mains out of the building. They are installed during the construction phase of a project to ensure performance and facilitate ease of installation when the wellfield is completed. Bypasses and fill-ports can also be included for initial flushing/purging and testing.

The stub-out assemblies are shipped to the project job site with all open pipe ends capped to keep out any debris and allow pipe ends to be temporally buried until final hookup is required.

For more information, or to request a quote for a commercial project, click the link below or call 1-888-447-7757: