|
GeoClips
GHP Systems, Inc. is a proud OEM
distributor of u-bend pipe separators called GeoClips. GeoClips
are the latest in geothermal technology designed to enhance your vertical heat
exchanger (VHE) performance.
Geothermal Borehole Resistance
A standard VHE installation has the two pipes
that make up the u-bend pipe assembly that are either touching or are in close
proximity of each other, thus interfering with each others ability to exchange
energy with the earth. These u-bend pipes are usually encased with a 20%
solids bentonite grout (often required by State regulations) in order to seal
the borehole to prevent contamination of water aquifers below ground.
Although the bentonite grout mixture is excellent for sealing the borehole, it
has poor heat transfer characteristics and acts as an insulator restricting
energy exchange between the u-bend pipes and the surrounding soil. Recent
technology has designed u-bend pipe separators, called GeoClips, that
decreases borehole resistance, thereby significantly increasing the performance
of a VHE and lowering the installation costs by shortening required VHE
lengths.
The diagram below illustrates how the energy
flux of a VHE is affected by its configuration. The first configuration
uses no performance enhancing technology; therefore, the borehole resistance
greatly inhibits the exchange of energy of the circulating fluid and the
earth. The energy flux increases significantly with the use of u-bend pipe
separators in the second configuration. An even greater increase in the
capacity is gained by incorporating a thermally enhanced grout with the u-bend
pipe separator as shown in the third borehole configuration. A key point
to consider is that there is a balance between the added cost of increasing VHE
performance and the savings incurred by shortening the total VHE length.
Key Benefits of GeoClips:
- Optimizes
u-bend pipe placement within the borehole.
- Eliminates
negative effects of low thermal conductivity bentonite based grouts.
- Provides
maximum pipe separation within the borehole.
- Reduces
installation costs by shortening required VHE design lengths.
Independent Research:
The graph below illustrates results from a
thermal conductivity test performed by Okalahoma State University.
This test verifies that there is a substantial increase in the heat transfer
rate with GeoClip installations when compared to standard installations.

For additional information, including MSDS,
product data sheets, or a price quote, please complete
the information request form below or contact us at:
Telephone:
605-697-7869
FAX: 605-697-9118
Postal address:
1000 N 32nd Ave, Brookings, SD 57006
Electronic mail: sales@ghpsystems.com
|